-
Eurobrick installed inside and out at new home
» 20 Apr 2017
Eurobrick’s cladding systems were used to great effect on a stunning new build house in Gosforth. This high end, contemporary...
About 75m² of Eurobrick’s X-Clad system was used to create an eye catching exterior and the same amount of I-Clad for the interior of the home. The owners wanted to create an eye catching design to the outside of their house, while adding insulation, and also wanted to...
-
Eurobrick builds on most successful trading year
» 06 Mar 2017
Following on from its 25th anniversary year, Eurobrick is celebrating its most successful trading year ever in 2016, with sales...
Eurobrick is a wholly owned independent company and its specialist brick cladding systems are designed to suit all project needs, whether that’s exterior or interior, new build or retrofit, domestic, commercial and even high-rise. There is a solution for every requirement – and...
-
Eurobrick issues new product guide
» 12 Jan 2017
Following strong sales of brick slips throughout 2016, Eurobrick has issued the 6th Edition of its Product Guide, introducing...
The Britannia Range is an extensive collection of kiln fired, extruded brick slips. “Extruded” means that the bricks are manufactured as a slip, typically 15mm thick and as such require 60-70% less energy to fire than standard bricks. The brick slips are manufactured in standard...
-
Eurobrick cladding system enables speedy installation of new classroom
» 17 Oct 2016
Eurobrick Approved Installer NuBrick Developments recently completed an installation of Eurobrick’s P-Clad system on behalf of...
The project involved fitting 135m² of P-Clad to a new modular building off-site in Eco Off-Site Production’s factory in Yorkshire. For overall speed of delivery, installing the brick cladding in a controlled environment will produce significant productivity gains compared...
-
P-Clad approved for high rise buildings
» 15 Jul 2013
The UK’s leading brick slip cladding specialist, Eurobrick, has received approval for its P-Clad system to be installed on...
John Mayes, Managing Director of Eurobrick, is thrilled by the company’s latest certification saying: “The fire safety testing carried out by the Building Research Establishment (BRE) was intensive, but proves the quality of P-Clad. Having seen the testing process first hand, it...